Special services: Faculty Members Students Graduates

The 6th Conference on the Construction and Rebuilding of Power Plant Components Along with the 1st “Idea Power Plant”

 | Post date: 2020/02/15 | 
In way of meeting the objectives of construction within the nation, reviewing the obstacles and problems, especially regarding power plant components and related industries, and providing supportive approaches, the 6th Conference on the Construction of Power Plant Components and Equipment will be held from Feb 25th until Feb 27th by the Iranian Association of Power Plants (ASNA) in collaboration with the Ifa San’at-e Taba knowledge-based Engineering and Services Company, the Rey Power Production Management Company with the support of the Main Thermal Power Specialized Company, the Main SATKAB Specialized Management Company for the Production of water and power products, the Power Research and Iranian Industrial Equipment Manufacturers Association (SETSA). The event will take place at Amirkabir University of Technology, which is one of the country's main scientific-industrial poles.
 
Conference Objectives & Aims
- National construction of power plant components
- Upgrading & renewal of power plant components
-The obstacles and difficulties manufacturing within the nation
-Introducing the manufacturers and makers of power plant equipment and components
- Solutions and approaches of manufacturing chain management
- Introduction of new & innovative power plant technologies
- The role and significance of re-engineering in the reconstruction of power plant equipment and components
- Identifying the common processes in power, air, oil, gas and petrochemical plants
 
Date: Feb 25th until Feb 27th, 2020
Venue: Amirkabir University of Technology
Paper Submission Deadline: Feb 4th, 2020
Conference Secretariat Address: Taba Company, Building No. 2, Nami Alley, Tabriziyan Street, Across from the Central Bank, Mirdamad Boulevard, Tehran, Iran